Pasar al contenido principal

LAGOS URBAN TRANSPORT PROJECT 2 - Completion Report Preparation

Lamata_0

LAGOS STATE GOVERNMENT LAGOS URBAN TRANSPORT PROJECT 2
CONSULTANCY SERVICES FOR THE PREPARATION OF IMPLEMENTATION COMPLETION REPORT (ICR)
FINAL REPORT (JUNE 15, 2017)

The Lagos Metropolitan Area Transport Authority (LAMATA), the implementing agency of the Lagos Urban Transport Project Phase 2 (LUTP 2) commissioned Sages Consult Limited (the Consultant) on March 6, 2017, to prepare the Implementation Completion Report (ICR) in respect of the LUTP 2. The contract for the ICR is in satisfaction of requirements of the credit terms of the LUTP 2. The LUTP 2, a follow-up on the LUTP 1 (also implemented by LAMATA) became effective May 16, 2011 and is set to close on May 31, 2017, thus necessitating the preparation of the ICR.
The Consultant submitted an Inception Report to LAMATA (the Client) on March 13, 2017 and an Interim Report on April 19, 2017 as the first and second deliverables respectively of the ICR Consultancy. The Consultant has prepared this Draft Final Report as the third deliverable to the Client on the Consultancy.
At this stage, the Consultant having completed desk review of secondary data, undertaken field survey and analysed data collected can give a report on all aspects of the scope of work as contained in the Terms of Reference (TOR) and can also enumerate lessons learned and make recommendations for future outlook of the LUTP.

Sobre el mismo tema

  • Expert Voices Mateo Gómez – Soluciones desde el Sur Global: lecciones africanas para el transporte informal latinoamericano

    Training Materials & Recordings Disponible en 3 idiomas: Inglés, Francés, Español
  • Materiales de la Semana de la Movilidad Sostenible de Yaundé

    Training Materials & Recordings Disponible en 3 idiomas: Inglés, Francés, Español
  • Global Monitor 2026

    Reports & Case Studies Disponible en 3 idiomas: Inglés, Francés, Español
  • ¿Quién Paga Qué por la movilidad urbana? - Volumen II: Incrementar los recursos y optimizar las necesidades financieras

    Tools & Methodologies Disponible en 3 idiomas: Inglés, Francés, Español